Questions to take to the permit office
A short list built from the conditions that show up across the 15 rules on this site. Take the pod's size and the maker's spec page with you.
- Is the exemption line measured by floor area, roof area or inside the walls? (Seattle and Denver count the roof; Portland measures inside the walls.)
- Does a 120 sq ft building count as under a "less than 120" line? (Oakland and the city of San Mateo write it that way.)
- Does the exemption cover an office or music room, or only storage? (Seattle and San Francisco limit it to storage-type use.)
- Does one cable from the house to a pre-wired pod need an electrical permit?
- Does a heater, portable AC or mini-split change the answer? (Denver's rule says non-conditioned.)
- What is the height limit, and is it measured to the peak or the average roof height?
- What are the setbacks from the side and rear property lines and from the house?
- Is a zoning permit needed even when the building permit is not? (Portland, Denver, Oakland and Raleigh mention one.)
- Is the lot in a flood hazard area, a fire district or an environmentally critical area?
- How many exempt buildings are allowed per lot? (Oakland: one; San Mateo County: a second needs 50 ft of spacing.)
Studio Home publishes its own list of questions for the building department, covering zoning, engineer-stamped plans, lot coverage and setbacks, in its FAQ (read Nov 5, 2026).
HOA rules are separate from city rules. An HOA can say no to a building the city allows.